Dinas Pekerjaan Umum & Tata Ruang
No | NAMA LENGKAP | KECAMATAN/KOTA | KETERAMPILAN | TAHUN BIMTEK | KUALIFIKASI | VIEW SKK |
---|---|---|---|---|---|---|
241 | Asmuni Salahudin | CIPONGKOR | HAMMER DRILL | 2016 | BELUM | |
242 | Lanang Sihombing | NGAMPRAH | KAYU DAN KUSEN | 2016 | BELUM | |
243 | Hartana Hakim | CIHAMPELAS | MESIN BROKER | 2019 | BELUM | |
244 | Cengkal Budiyanto | PADALARANG | GALI | 2019 | BELUM | |
245 | Baktiono Mustofa | PARONGPONG | KAYU DAN KUSEN | 2018 | BELUM | |
246 | Anggabaya Damanik | CILILIN | KITCHENSET | 2020 | BELUM | |
247 | Anggabaya Wijaya | GUNUNG HALU | KITCHENSET | 2020 | BELUM | |
248 | Galih Najmudin | CIPATAT | KAYU DAN KUSEN | 2015 | BELUM | |
249 | Gandi Pradipta | BATUJAJAR | HAMMER DRILL | 2020 | BELUM | |
250 | Wira Wibisono | CIHAMPELAS | HAMMER DRILL | 2017 | BELUM | |
251 | Ade Natsir | CIPATAT | GALI | 2015 | BELUM | |
252 | Prabu Kuswoyo | CIPEUNDEY | PEMBESIAN | 2017 | BELUM | |
253 | Marsudi Suwarno | GUNUNG HALU | RELIEF | 2018 | BELUM | |
254 | Nugraha Halim | CIKALONG WETAN | BANGUNAN GEDUNG LEVEL 1 | 2020 | BELUM | |
255 | Ihsan Siregar | CIPONGKOR | PENGECATAN | 2018 | BELUM |
Dinas Pekerjaan Umum & Penataan Ruang
Pemerintah Kabupaten Bandung Barat
Sistem Informasi Pembina Jasa Konstruksi Pemerintah Kabupaten Bandung Barat adalah platform digital untuk meningkatkan efisiensi dan transparansi dalam pengelolaan proyek konstruksi. Sistem ini memantau pelaksanaan proyek, memastikan kepatuhan terhadap standar, dan memfasilitasi komunikasi antara pemerintah, kontraktor, pengawas, tenaga ahli, dan masyarakat. Hal ini diharapkan dapat meningkatkan kualitas infrastruktur dan mempercepat proses administrasi.
5G56+HX3, Mekarsari, Kec. Ngamprah, Kabupaten Bandung Barat, Jawa Barat 40552 Indonesia
@2024 | Designed by CV. Angkasa Raya Teknik